
New Launch31 Mar 2026, 05:43 pm
NTPC Green Energy Ltd. Declares Commercial Operation of 50.7 MW Capacity from its Joint Venture
AI Summary
NTPC Green Energy Ltd. has declared the commercial operation of 37.5 MW solar and 13.2 MW wind capacity from the fourth and seventh parts of the total installed capacity of 150 MW solar and 100 MW hybrid projects located in Gujarat. These projects are owned by Ayana Renewable Power Four Private Limited, a step-down subsidiary of the joint venture ONGC NTPC Green Private Limited. The current commercial capacity of NTPC Green Energy Limited Group stands at 10,075.70 MW, and with the addition of these capacities, the total installed capacity will increase to 10,126.40 MW.
Key Highlights
- NTPC Green Energy Ltd. declares commercial operation of 37.5 MW solar and 13.2 MW wind capacity.
- The projects are located in Gujarat and are owned by Ayana Renewable Power Four Private Limited.
- The joint venture ONGC NTPC Green Private Limited has a stake in the projects through its step-down subsidiary.
- The current commercial capacity of NTPC Green Energy Limited Group is 10,075.70 MW.
- The total installed capacity of the NTPC Green Energy Limited Group will increase to 10,126.40 MW with the addition of these capacities.
Price Impact
More from NTPCGREEN