
Project UpdateNov 23, 2026, 10:41 AM
Blue Moon Metals: Ore Sorting Boosts Tungsten Grades at Springer Mine
AI Summary
Blue Moon Metals Inc. announced positive initial ore sorting results from its Springer tungsten mine in Nevada. The sensor-based particle sorting technology showed potential for pre-concentration, enhancing tungsten grades and improving project economics. The study achieved WO3 grade uplifts of 1.3x to 3.4x with high metal recovery rates between 93.3% and 97.5%. The company plans further studies in 2027 to integrate this technology into its processing plant.
Key Highlights
- Ore sorting technology demonstrated potential for pre-concentration at Springer mine.
- Achieved 1.3x to 3.4x uplift in WO3 grades with 93.3% to 97.5% metal recovery.
- Mass rejection of low and medium-grade material ranged from 25.1% to 71.7%.
- High-grade composite showed a 1.3x WO3 upgrade, rejecting 22.6% of feed material.
- Medium-grade composite showed a 2.5x WO3 upgrade, rejecting over 60% of feed material.
- Low-grade composite showed a 3.4x WO3 upgrade, rejecting 69.3% of feed material.
- Further ore sorting and engineering studies are planned for 2027.
Price Impact
More from BMM