StockWatch
·
Precious Metals
Project UpdateJun 18, 2026, 06:51 AM

Endeavour Silver Reports High-Grade Drill Results at Terronera Mine

AI Summary

Endeavour Silver Corp. announced positive drill results from its exploration program at the Terronera mine in Jalisco, Mexico. The program, the first since 2020, focused on expanding and defining mineralization at the La Luz system and Terronera vein. Key highlights include high-grade silver and gold intercepts, successfully extending mineralization along strike and at depth, which supports resource growth and mine life extension. Mining at the high-grade La Luz deposit is expected to commence in 2027.

Key Highlights

  • Completed 43 drill holes (7,015m) at La Luz and 10 holes (1,904m) at Terronera vein.
  • LL-43 intersected 2,607 g/t AgEq over 1.06 meters true width at La Luz.
  • LL-77 intersected 1,340 g/t AgEq over 0.94 meters true width at La Luz.
  • TRU-001 intersected 435 g/t AgEq over 8.11 meters true width at Terronera.
  • TRU-003 intersected 686 g/t AgEq over 5.32 meters true width at Terronera.
  • Drilling successfully extended mineralization along strike and at depth.
  • Mining at the high-grade La Luz deposit is expected to commence in 2027.
  • Two drill rigs continue operating at Terronera through Q4.