StockWatch
·
Gold and Silver Ores
Project UpdateJul 15, 2026, 06:12 AM

Titan Mining Validates Kilbourne Graphite Flowsheet, Achieves Battery-Grade Purity

AI Summary

Titan Mining Corporation announced positive results for its Kilbourne Graphite Project, validating its concentrator flowsheet and achieving battery-grade spherical graphite. The concentrator exceeded Preliminary Economic Assessment (PEA) design assumptions, producing 95.9% C(t) graphite concentrate at 91.4% recovery. Downstream processing consistently yielded ≥99.90% Fixed Carbon purified graphite with an industry-leading spherical graphite conversion rate of approximately 66%. These results de-risk the ongoing Feasibility Study and support the company's plan to build the first fully integrated U.S. graphite supply chain in over 70 years.

Key Highlights

  • Concentrator flowsheet validated, exceeding PEA design basis.
  • Produced 95.9% C(t) graphite concentrate at 91.4% recovery.
  • Achieved battery-grade purified graphite (≥99.90% Fixed Carbon).
  • Spherical graphite yield of approximately 66%, exceeding industry average of 50%.
  • Engineering for concentrator and Secondary Transformation Plant is advancing.
  • Demonstration plant continues production for customer qualification.