StockWatch
·
Metal Mining
Project UpdateMay 15, 2026, 05:02 PM

U.S. Gold Corp. Finalizes CK Gold Project Feasibility Study Report

AI Summary

U.S. Gold Corp. finalized a Technical Report Summary detailing the results of its feasibility study for the CK Gold Project, effective March 30, 2026. The report, titled "S-K 1300 Technical Report Summary Feasibility Study for the CK Gold Project, Wyoming, USA," was prepared by the Company and Micon International Limited in accordance with Subpart 1300 of Regulation S-K. This summary is furnished as Exhibit 96.1 with the current Form 8-K.

Key Highlights

  • U.S. Gold Corp. finalized the Technical Report Summary for its CK Gold Project feasibility study.
  • The report is titled "S-K 1300 Technical Report Summary Feasibility Study for the CK Gold Project, Wyoming, USA".
  • The feasibility study report is effective as of March 30, 2026.
  • The report was prepared by U.S. Gold Corp. and Micon International Limited.
  • It complies with Subpart 1300 of Regulation S-K.
  • The Technical Report Summary is furnished as Exhibit 96.1 with the Form 8-K.