StockWatch
·
Metal Mining
Project UpdateJul 31, 2026, 11:36 AM

Vale Starts Commissioning Serra Sul +20 Project, Adding 20 Mtpy Capacity

AI Summary

Vale S.A. has initiated the commissioning of the long-distance conveyor belt for its Serra Sul +20 project, marking the beginning of its start-up. This project, combined with the Compact Ore Crusher project set for 4Q26, is anticipated to add 20 Mtpy of iron ore production capacity and enhance operational flexibility at the S11D operation in Brazil. The initiative is a strategic component of the Novo Carajás Program, aiming to boost overall iron ore production to approximately 360 Mt by 2030 and strengthen Vale's high-grade product offerings.

Key Highlights

  • Vale commenced commissioning of the long-distance conveyor belt for the Serra Sul +20 project.
  • The project is expected to add 20 Mtpy of iron ore production capacity.
  • It will increase operational flexibility at the S11D operation in Canaã dos Carajás, Brazil.
  • The Compact Ore Crusher project, part of the initiative, is scheduled to start up in 4Q26.
  • The project contributes to Vale's plan to reach 360 Mt of iron ore production by 2030.
  • The mining operating license for the project was received in September 2025.