Project UpdateJun 2, 2026, 06:02 AM
Beam Global deploys 6 EV ARC systems for Long Beach, CA
AI Summary
Beam Global announced the deployment of six additional EV ARC solar-powered electric vehicle charging systems for the City of Long Beach, California. Four systems will support the City's EV fleet operations, with two more at Long Beach Airport. These rapidly deployable, off-grid systems help the City electrify its fleet, reduce costs, and lower emissions without straining existing electrical infrastructure. This deployment further expands Beam Global's presence in municipal fleet operations and demonstrates continued demand for its solutions in California.
Key Highlights
- Beam Global deployed 6 additional EV ARC systems for the City of Long Beach, California.
- Four EV ARC systems support the City of Long Beach's electric vehicle fleet operations.
- Two additional EV ARC systems were installed at Long Beach Airport for fleet charging.
- The EV ARC systems are solar-powered, off-grid, and rapidly deployable.
- Deployment supports the City's transition to electric fleet vehicles and reduces emissions.
- Expands Beam Global's presence in municipal fleet operations across California.
Price Impact
More from BEEM