StockWatch
·
Metal Mining
Project UpdateAug 10, 2026, 07:17 AM

Blue Moon Reports Positive Drilling Results at Nussir Project

AI Summary

Blue Moon Metals Inc. announced positive drilling results from its ongoing infill and deep exploration programs at the Nussir Project in Norway. The infill drilling confirmed mineralization continuity over a 700m strike length, with highlights including 1.6m at 1.93% Cu in hole NUS-DD-26-02, aiming to upgrade resources and optimize mine design. Deep exploration drilling also yielded encouraging results, with hole NUS-DD-26-07 intersecting 3.7m at 1.39% Cu. Additionally, the company extended its marketing engagement with Outside The Box Capital for US$175,000 and entered a new digital marketing agreement with Winning Media LLC for US$100,000.

Key Highlights

  • Infill drilling confirmed mineralization continuity over 700m strike length at Nussir Project.
  • Infill hole NUS-DD-26-02 returned 1.6m at 1.93% Cu, 0.15 g/t Au, 20.2 g/t Ag.
  • Deep exploration hole NUS-DD-26-07 intersected 3.7m at 1.39% Cu, 0.05 g/t Au, 16.8 g/t Ag.
  • Infill drilling aims to upgrade Indicated Resource to Measured Resource and update MRE.
  • Extended marketing engagement with Outside The Box Capital for US$175,000.
  • Entered new digital marketing agreement with Winning Media LLC for US$100,000.
  • Hole NUS-DD-26-08 intersected 0.6m at 0.69 g/t Pt and 0.42 g/t Pd.