StockWatch
·
Precious Metals
Project UpdateJun 18, 2026, 06:56 AM

Endeavour Silver Intersects High-Grade Silver & Gold at Terronera

AI Summary

Endeavour Silver Corp. announced positive drill results from its exploration program at the Terronera operation in Jalisco, Mexico. The program, which included 43 drill holes at La Luz and 10 at Terronera, successfully extended high-grade silver and gold mineralization along strike and at depth. These results are expected to support future resource growth, mine design, and long-term planning, with mining at the La Luz deposit anticipated to begin in 2027.

Key Highlights

  • La Luz drill hole LL-43 returned 2,607 g/t AgEq over 1.06 meters true width.
  • La Luz drill hole LL-77 showed 1,340 g/t AgEq over 0.94 meters true width.
  • Terronera drill hole TRU-001 yielded 435 g/t AgEq over 8.11 meters true width.
  • Terronera drill hole TRU-003 reported 686 g/t AgEq over 5.32 meters true width.
  • Drilling at both La Luz and Terronera extended mineralization along strike and at depth.
  • Mining of the high-grade La Luz deposit is expected to commence in 2027.
  • Two drill rigs continue exploration at Terronera through Q4 2026.