StockWatch
·
Other Metals and Minerals
Project UpdateJul 14, 2026, 07:31 AM

Frontier Nuclear Launches 2026 Drill Program at Pine Ridge Uranium Project

AI Summary

Frontier Nuclear and Minerals Inc. has commenced its 2026 drill program at the 100% owned Pine Ridge uranium project in Wyoming. The extensive 36,000-meter program, consisting of approximately 120 holes, aims to define roll front deposits and generate a maiden mineral resource estimate by early 2027. This follows a successful 2025 program that confirmed widespread uranium mineralization and identified multiple roll fronts, indicating significant potential for future In-Situ Recovery development.

Key Highlights

  • Frontier Nuclear launched its 2026 drill program at the Pine Ridge uranium project.
  • The program involves approximately 120 holes totaling 36,000 meters.
  • Objective is to define roll front deposits and prepare a maiden mineral resource estimate (MRE) by early 2027.
  • The 2025 drill program confirmed widespread uranium mineralization and identified at least 25 mineralized roll fronts.
  • Drilling is expected to run from July to December 2026, potentially extending into January 2027.
  • Pine Ridge project covers approximately 39,390 acres in Wyoming's Powder River Basin.
  • Frontier expanded the claim block by adding 54 federal mining claims, comprising 854 acres.