STOCKWATCH
·
Mining & Quarrying of Nonmetallic Minerals (No Fuels)
Project UpdateMay 11, 2026, 08:57 AM

Galiano Gold expands Abore system with 32m @ 4.7 g/t Au, 53m @ 3.9 g/t Au

AI Summary

Galiano Gold reported positive assay results from the Abore drilling program at the Asanko Gold Mine in Ghana, significantly expanding the mineralized system. The drilling successfully extended mineralization at depth, along strike, and in previously untested areas, including new high-grade zones beneath the Abore Main Pit and 180m below the existing underground Mineral Resource. The company has completed 14,500m of the planned 30,000m program and initiated permitting for an underground exploration drilling adit, targeting early 2027 for ground breaking.

Key Highlights

  • Abore drilling program yielded intercepts including 32m @ 4.7 g/t Au and 53m @ 3.9 g/t Au.
  • Step-out drilling extended mineralization up to 180m below the existing underground Mineral Resource.
  • A new high-grade zone was identified beneath the Abore Main Pit with 4.1 g/t Au over 9m.
  • Approximately 14,500m of the planned 30,000m drilling program has been completed.
  • Permitting initiated for an underground exploration drilling adit, targeting early 2027 for ground breaking.
  • Hole ABDD26-458 intersected 3.0 g/t Au over 21m, 180m below the current underground Mineral Resource.
  • Hole ABDD26-477 intersected 3.9 g/t Au over 53m, extending the high-grade South zone.
GAU
Mining & Quarrying of Nonmetallic Minerals (No Fuels)
Galiano Gold Inc.

Price Impact