STOCKWATCH
·
Telecom - Infrastructure
Deals28 Mar 2025, 12:06 am

Bondada Engineering Ltd Subsidiary Receives Work Order of Rs. 4,91,21,925 from SR Power Systems India

AI Summary

Bondada Engineering Ltd announced that its subsidiary, Bondada Green Engineering Private Limited, has received a work order from SR Power Systems India Private Limited for the supply of 220KV MS tower parts. The order, valued at Rs. 4,91,21,925 (including GST), is to be delivered at Mancherial, Telangana. The time period for execution is within one week after receiving drawing approval.

Key Highlights

  • Bondada Engineering Ltd's subsidiary, Bondada Green Engineering Private Limited, has received a work order from SR Power Systems India Private Limited.
  • The order is for the supply of 220KV MS tower parts.
  • The order value is Rs. 4,91,21,925 (including GST).
  • The delivery location is Mancherial, Telangana.
  • The execution time period is within one week after receiving drawing approval.
BONDADA
Telecom - Infrastructure
Bondada Engineering Ltd

Price Impact