StockWatch
·
Consulting Services
Joint Venture18 Sept 2026, 10:36 am

DMR Engineering JV Secures ₹70 Cr Hydro Electric Project Contract

AI Summary

DMR Engineering Ltd, as the Lead Member in a Joint Venture with Shri Balaji Hydro Construction Private Limited, has received a Letter of Award (LoA) for the formation of a new JV Company. This JV will execute Package-I works for the 24.60 MW Kamlang Small Hydro Electric Project in Arunachal Pradesh. DMR will hold a 51% stake in the JV, with SBHCPL holding 49%. The contract, awarded by Arun Shakti Energy Private Limited, has a tenure of 780 days and an aggregate value of Rs. 70 Crore, exclusive of GST. The scope includes construction of a Coffer Dam for River Diversion and Barrage.

Key Highlights

  • DMR Engineering forms JV for ₹70 Cr hydro project.
  • JV to construct coffer dam and barrage for 24.60 MW project.
  • DMR to hold 51% equity in the new joint venture.
  • Contract duration is 780 days.
  • Awarded by domestic entity Arun Shakti Energy Private Limited.