
New Launch23 Aug 2025, 03:31 pm
Interarch Building Solutions Secures 90 Crore Order from RunGta Mines Limited
AI Summary
Interarch Building Solutions Ltd. has announced that it has received a Letter of Intent (LOI) from RunGta Mines Limited for a 90 Crore order. The order is for the Design, Engineering, Manufacturing, Supply & Erection of Pre-Engineered Steel Building System. The order is expected to be executed within 6 to 8 months. This is in line with the Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations.
Key Highlights
- Interarch Building Solutions secures a 90 Crore order from RunGta Mines Limited.
- The order is for the Design, Engineering, Manufacturing, Supply & Erection of Pre-Engineered Steel Building System.
- The order is expected to be executed within 6 to 8 months.
- The announcement is in line with the Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations.