
Jindal Steel Completes 6 MTPA Expansion at Angul, Taking Capacity to 12 MTPA
Jindal Steel has completed its 6 MTPA expansion at its Angul Integrated Steel Complex in Odisha by commissioning the third Basic Oxygen Furnace (BOF-3) of 3 MTPA. This expansion has taken the plant’s total crude steel capacity to 12 MTPA, positioning it among India’s largest single-location integrated steel complexes. The expansion includes the operationalisation of BOF 2 & BOF-3, along with a suite of associated upstream and downstream facilities, ensuring seamless integration and ramp-up of capacity. This expansion has fully operationalised the company’s expansion from 6 MTPA to 12 MTPA at Angul within the planned timeframe. The expanded capacity is expected to drive higher volumes and improve capacity utilisation, supporting revenue growth while delivering operating leverage benefits. With increased integration and scale, the company is well-positioned to enhance margins, optimise costs, and improve profitability, while strengthening domestic steel capacity in line with India’s nation-building priorities and the vision of Atmanirbhar Bharat.
Key Highlights
- Jindal Steel completes 6 MTPA expansion at Angul
- Commissioning of third Basic Oxygen Furnace (BOF-3) of 3 MTPA
- Total crude steel capacity now 12 MTPA
- Expansion includes operationalisation of BOF 2 & BOF-3 and associated facilities
- Expected to drive higher volumes, improve capacity utilisation, and support revenue growth