StockWatch
·
Cement & Cement Products
Expansion8 Jul 2026, 02:15 pm

KCP Ltd Commissions 15.80 MW WHR System at Muktyala Plant

AI Summary

KCP Ltd has successfully commissioned a 15.80 MW Waste Heat Recovery System (WHR) with a 16.58 MW turbine capacity at its cement manufacturing unit in Muktyala, Andhra Pradesh. This development is expected to enhance operational efficiency and potentially reduce energy costs for the company's cement production facility.

Key Highlights

  • Commissioned 15.80 MW Waste Heat Recovery System (WHR).
  • Turbine capacity stands at 16.58 MW.
  • System installed at Muktyala Cement Plant, Andhra Pradesh.
  • Aims to improve operational efficiency and reduce energy costs.