STOCKWATCH
·
Integrated Power Utilities
MoU17 Sept 2024, 02:53 am

Torrent Power Ltd. Signs MoU with Gujarat Government for 5 GW Solar, Wind or Hybrid Project

AI Summary

Torrent Power Ltd. has entered into a Memorandum of Understanding (MoU) with the Government of Gujarat for the execution of a 5 GW solar, wind, or solar-wind hybrid project in Dwarka District, Gujarat. The MoU was signed on September 16, 2024, at 05:00 pm (IST). This initiative is in compliance with the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.

Key Highlights

  • Torrent Power Ltd. has signed an MoU with the Government of Gujarat for a 5 GW solar, wind, or solar-wind hybrid project.
  • The project will be located in Dwarka District, Gujarat.
  • This initiative is in line with SEBI LODR regulations.
  • The MoU was signed on September 16, 2024.
  • The project represents a significant commitment to renewable energy.
TORNTPOWER
Integrated Power Utilities
TORRENT POWER LTD.

Price Impact