
MoU17 Sept 2024, 02:53 am
Torrent Power Ltd. Signs MoU with Gujarat Government for 5 GW Solar, Wind or Hybrid Project
AI Summary
Torrent Power Ltd. has entered into a Memorandum of Understanding (MoU) with the Government of Gujarat for the execution of a 5 GW solar, wind, or solar-wind hybrid project in Dwarka District, Gujarat. The MoU was signed on September 16, 2024, at 05:00 pm (IST). This initiative is in compliance with the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
Key Highlights
- Torrent Power Ltd. has signed an MoU with the Government of Gujarat for a 5 GW solar, wind, or solar-wind hybrid project.
- The project will be located in Dwarka District, Gujarat.
- This initiative is in line with SEBI LODR regulations.
- The MoU was signed on September 16, 2024.
- The project represents a significant commitment to renewable energy.