StockWatch
·
ZELIO E MOBILITY LTD · QQ2 FY-2027 · THE CALL

120% growth, margin hold: execution beats guidance, working capital tested

The verdict, the claims that held up, the sharpest analyst exchanges, and the risks — the earnings call, decoded from the transcript.

Q2 FY27 resultsZELIOZelio E Mobility Ltd19 Nov 2026 · 6 min read
Verdict

Hold

confidence 7/10

Credibility

Grade A

Delivered 120% revenue vs 75-80% guide in H1, affirmed FY27 targets; 125k unit pace confirmed; 550 dealer pace on track despite pause.

Short-term outlook

Optimistic

next 1–2 quarters

Long-term outlook

Optimistic

multi-year

Exceptional H1 delivery (120% rev, 164% PAT growth) validates management execution and market tailwinds. Guidance maintained (75-80% FY27 growth, 125k+ units, 550 dealers). But near-term headwinds: working capital remains negative, debt/equity rose 0.18→0.31x, 1-2% EBITDA margin hit from R&D capex ahead. Dealer expansion paused (400-450 vs 550 target) due to demand surge and capacity constraints—wait for H2 capex payoff.

₹296.7 Cr

Revenue · +120.1% YoY

₹31.4 Cr

Reported PAT · +164.3% YoY

Expanding

Margins · vs guidance: Corroborated

Did the claims hold up?

Management's claims vs. the numbers

Half-year revenue more than double YoY

MET

296.7 Cr vs ~135 Cr prior H1, +120% YoY

Profit more than 2.5x prior year

MET

31.4 Cr vs ~11.9 Cr prior H1, +164% YoY

EBITDA margin up from 12% to 13.6%

MET

EBITDA 40.49 Cr ÷ 296.7 Cr = 13.6%

On track for 125k units in FY27

MET

62k+ units in H1, run-rate ~124k annualized

No competitors in low-speed segment

OVERSTATED

Company has 8-9% share; market is unorganized but growing with smaller entrants

Earnings quality

What changed since the last call

Deltas vs. the prior call

Dealer expansion: paused, then resume

Neutral

Prior call: pushing to 550. Now: stuck at 400-450 because demand surge overwhelmed capacity. Plan to resume expansion once capex eases in H2 FY27.

Market share ambition: timeline extension

Downgrade

Prior guidance: 20-30% EV two-wheeler share in 2-3 years (by 2027-28). New: 25% share by 2030 (10-year horizon). Same number, later target = slower pace.

Capex priority: R&D + backward integration upgrade

Upgrade

Prior: plant expansion (Patan plant commissioned). New: ₹168 Cr capital raise explicitly for tech (motors, batteries, power training). Signals shift from capacity to self-reliance.

Capacity utilization: improved but constrained

Neutral

Hisar 70-80%, Odisha 50%, Coimbatore 30% (new, 3mo old). Prior: 1 plant at 72k units. Now: 4 plants, 312k capacity. Utilization spread reflects intentional ramp, not under-demand.

The Q&A

Analysts pressed hard on 4 fronts: (1) Product mix (low-speed vs high-speed, SKU pricing, raw-material pass-through) — mgmt answered directly with percentages, SKU counts, ASP detail. (2) Competitive threat and market share — mgmt deflected slightly ('no competitors in low-speed') but then clarified with 8-9% share, roadmap to 25% in 2 years. (3) Working capital and capex sustainability — mgmt was transparent (negative OCF, rising debt) but reassuring (receivables <6 days, inventory for seasonal demand). (4) Long-term targets and revenue guidance — mgmt refused to quantify FY30 revenue, backed away when pushed ('cannot disclose'). Overall: confident and detailed on operations, cautious and evasive on forward guidance. Analysts didn't back down; mgmt held the line.

The exchanges that mattered

Revenue growth, product mix, ASP — Taher Hyderabadwala, Grobiz Fund

Answered

H1 FY26: 70k two-wheelers full year. H1 FY27: 62k+ two-wheelers in 6 months alone. High-speed: launching this year (currently <max mix). ASP rose INR 45k→48-50k due to raw material inflation 3-4 months ago; EV demand offset inflation, no demand hit.

Capacity utilization, plant ramp — Taher Hyderabadwala, Grobiz Fund

Answered

Hisar 70-80%, Odisha 50%, Coimbatore 30% (new, 3mo old, developing dealer network). Patan: will ramp to ~80% within next 2 years.

Market share, low-speed competition — Kushal Kasliwal, InVed Research

Answered

8-9% combined share currently. Target 25% within 2 years. Electric market only 17% penetrated vs petrol. Larger players entering but Zelio ahead on quality and service. Market growing 50% annually, very large.

Commodity price impact, demand elasticity — Kushal Kasliwal, InVed Research

Partial

EV demand rising day by day, outweighs commodity inflation. Metal prices affected everyone; Zelio matched price increases market-wide. No demand hit so far.

Distribution, dealer network, B2B strategy — Bharath Shankar, Individual

Answered

400+ dealers across 25+ states. Dealers matter most (trust, service, spares availability). Currently B2C (through dealers). Future B2B when capacity available. Last 2 months: transitioned from advance orders to stock availability.

Fund raise, capex plans, profitability — Bharath Shankar, Individual

Answered

Funds for R&D, backward integration (motors, batteries, power training). 2-3 year horizon to build own tech. Expansion into East and South. No new plant currently planned; focus on existing 4-plant capacity utilization.

Export, geographic expansion — Bharath Shankar, Individual

Answered

Nepal only market outside India currently (160+ scooters/month). Huge potential in India, exploring domestically for now.

Capacity utilization, production volumes — Debjyoti Mondal, Tandra Capital

Answered

Overall 40-50% (combined). Patan new, utilization improving rapidly with dealer build in South.

R&D spend, tech roadmap, margin impact — Debjyoti Mondal, Tandra Capital

Answered

₹168 Cr raised; will develop motors, batteries, power training in-house over 2-3 years. EBITDA impact 1-2% from R&D. Currently doing backward integration via reverse engineering; will hire professionals.

Main board listing, liquidity — Anup Chotani, Individual

Answered

1-2 years, maybe 2 years. Focus on growth first. Very well on operations.

High-speed market entry, strategy — Naman, Shanghvi Family Office

Partial

Battery pack R&D most important differentiator. Currently import lead-acid (Vietnam, Malaysia, China). Will develop own batteries after 2-3 years. High-speed and low-speed both easy segments; focus on durable, affordable products.

Tanga (3-wheeler), market size, strategy — Naman Saraf, Saraf Family Office

Answered

Target 2-3k units next FY. Currently sourcing third-party; will manufacture in-house from Patan. Market unorganized but organized players entering (Bajaj, Mahindra, Piaggio). Pricing power good due to quality; will compete on price vs bigger players.

Dealer network expansion, utilization — Ankit Shah, Individual

Answered

400-450 currently. Expansion paused last 6 months because demand surge overwhelmed existing dealers. Needed to fulfill existing dealer demand before adding new. Now expanding capacity, will resume dealer expansion.

Low-speed vs high-speed SKU mix, revenue — Ankit Shah, Individual

Answered

More than 50% units low-speed (goal). Last 2 months: 1 high-speed SKU only. Launching 2-3 high-speed models in next 1-2 years. Government gets no separate revenue on high-speed (most states free registration). Low-speed: INR 50k (best for affordable market).

Tariff regulation, unregistered vehicle limits — Naman Saraf, Saraf Family Office

Answered

MoRTH draft 3 months ago (not in act yet) would increase 250W limit to 600W. Government entirely positive toward low-speed. Rules beneficial for Zelio (quality, rules, Chinese players not complying).

Import %, backward integration — Vaibhav Jain, Nucleus Capital

Answered

16-17 SKUs total. Tanga: 20-30% import (electrical parts). Two-wheelers: 4 SKUs (70% in-house), 4-8 SKUs (40% in-house, 70% imported), 7-8 SKUs (100% imported). Patan plant will source parts locally.

Custom duty notice, compliance — Vaibhav Jain, Nucleus Capital

Answered

Not paid; fighting customs appeal. Notice baseless (industry-wide issue, all importers faced same). Will likely win at industry level. Lead-acid batteries imported for low-speed. All ERP and pollution compliance met. Battery warranty replacement ~3-4%.

Borrowing limit, capex financing — Vaibhav Jain, Nucleus Capital

Dodged

No specific motive. Increased for future flexibility (expanded from prior). Will use as needed.

FY27-28 outlook, margin pressure — Arvind Jhadav, Individual

Dodged

H2 will be greater (Diwali Oct-Nov strong season). Cannot disclose H2 profit. FY30 target: >1M scooters, 25% market share. Currently 8-9% market share. Will not disclose specific revenue number.

Competitive positioning, cost structure — Arvind Jhadav, Individual

Overstated

No competitors in low-speed. High-speed: legacy players, newer entrants. Zelio better on quality, service. Pricing: products less price, good quality. India price-sensitive.

Guidance

Forward guidance and management's confidence

FY27: 75-80% YoY revenue growth (from FY26 ~₹240 Cr base ≈ ₹420-432 Cr target)

High

Reaffirmed in call. H1 at 120% puts full-year on track if H2 moderates to 50-60%. Diwali season strong (Oct-Nov). Implies H2 ₹120-140 Cr for 75-80% full-year CAGR.

EBITDA margin: maintain 13-14% despite 1-2% R&D headwind

Medium

H1 at 13.6%; mgmt says 1-2% R&D impact ahead but capacity leverage should offset. Assumes volume scale & ASP stability.

NPM: >10% (from current 10.5%), never trade profit for volume

High

Explicitly stated. No discounting on price, no dealer subsidy. Volume growth discipline maintained.

₹168 Cr capital raise for R&D, backward integration, capacity prep

High

Preferential issue approved. Funds for motors, batteries (2-3 year dev cycle), power training. Phased over 2-3 years.

Risks the call surfaced

Ranked by how much they should concern a holder

Working Capital & Cash Burn

High

H1 OCF negative (amount unclear); inventory buildup for Coimbatore (30% utilization) and Patan ramp; borrowings ₹44.82 Cr, up from ~₹25 Cr. Debt/equity 0.31x (comfortable but rising).

Market Share / Competition

Medium

Low-speed is 50%+ of business; at 8-9% market share, unorganized competition risk. Smaller players entering (INR 50-70 Cr to 200-300 Cr sales targets), legacy players expanding, Ather/Konarc in high-speed. Electric market still young (17% penetrated), room for all, but pricing power tested.

Product Mix & Market Transition

Medium

Low-speed >50% of mix (mature segment, margins lower than potential). High-speed entry at 1-2 years launches risks tech viability, timing, margin recovery. Tanga (3-wheeler) is new, unorganized market, execution unproven. MoRTH draft (600W limit) could shift demand mix, regulatory uncertainty.

Supply Chain & Import Dependence

Medium

Show-cause notice INR 6.72 Cr for custom duty dispute (unpaid, under appeal). Lead-acid batteries fully imported (Vietnam, Malaysia, China). 16-17 SKUs with varying import levels (40-100%). Backward integration 2-3 years away.

R&D / Technology Execution

Medium

INR 168 Cr capex for in-house motor & battery development is aggressive. 2-3 year timeline for first products. If timeline slips or tech underperforms vs imported benchmarks, margin recovery delayed and capital write-off risk.

Geographic Concentration

Low

Only Nepal outside India (160+ scooters/month). India business concentrated in South (Ladwa HQ, Coimbatore new, Cuttack/Patan for regional expansion). North/East penetration lower (West Bengal emerging, still 1400-1500 units/month vs larger southern volumes).

Management

Score 8/10. Detailed and transparent on operations (product mix, capacity, dealer network, SKU count). Evasive on forward guidance (refuses FY30 revenue, hedges on H2 profit). Repeats themes across questions but doesn't dodge core business metrics. Exceptional: delivered 120% revenue, 164% PAT growth vs 75-80% guidance. 4 plants built in 18 months (Patan, Coimbatore, Cuttack from scratch). Dealer network 400+ on track for 550. Unit volume 62k H1 on track for 125k FY27. Zero misses on operational milestones.

What to watch next
  • 1 · H2 FY27

    Diwali season strength (Oct-Nov carried strong demand), Patan plant ramp-up, dealer network expansion resumed

  • 2 · FY27-28

    2-3 high-speed SKU launches, Tanga (3-wheeler) production ramp to 2-3k units, low-speed backward integration on motors/batteries

  • 3 · FY28

    Backward integration tech results (motors, batteries built in-house), Coimbatore and Patan utilization climb toward 70-80%

Dealer expansion paused (400-450 vs 550 target) due to demand surge and capacity constraints—wait for H2 capex payoff.

Informational and educational content only. Not investment advice.