Filing
Result:Good· Market: Flat#Margin expansion

Outlook: Cautiously Optimistic · Guidance: Raised

MetricValue (₹ Cr)Q1 FY27Q2 FY26
Revenue11.8K2.8%3.0%
Total Income12.1K3.1%3.3%
Expenditure7.5K5.2%3.2%
PBT4.6K0.3%16.1%
Net Profit3.9K7.4%8.4%
OPM82.26%2.84pp
NPM32.07%1.31pp1.51pp
EPS4.167.5%8.3%
View full financials

Core transmission PBIT grew a steady 5% YoY on rising CERC-recognised tariff income, with consolidated PAT up 8.4% YoY on margin expansion (32.1% vs 30.6% NPM), healthy but not a standout given revenue growth of just ~3% and rising finance costs from debt-funded capex.

POWERGRID · Q2 FY27 · THE VERDICT

₹2.20 Lakh Crore Order Book Masks a 3% Revenue Quarter

Capex guidance widened and project execution remains strong, but Q2 revenue grew only 3% YoY as regulatory tariff headwinds offset transmission growth. The real story is a multi-year pipeline that near-term earnings will struggle to match.

10 Nov 2026 · 6 min read
Reported PAT

₹3,866 Cr

+8.4% YoY

JV interest boost

~₹407 Cr

₹794 → ₹1,201 Cr (non-operational)

Organic PAT growth

~3–4%

After interest normalization

Revenue growth

+3.0%

Regulatory tariff headwind ₹193 Cr

On the surface, POWERGRID's Q2 profit grew 8.4% — a solid beat. But dig into the components and the picture unravels: operating income on transmission grew 7.7%, yet consolidated revenue inched up just 3%. The gap is a regulatory asset tariff decline of ₹193 crore that hammered the top line. Worse, ₹407 crore of the profit growth came from financing income on joint-venture subsidiaries, not core transmission earnings. Strip those out, and organic PAT growth drops to the low single digits — matching a revenue quarter starved of transmission volume acceleration.

The tension: order book visibility vs. near-term growth

Here is where POWERGRID's capex guidance shift matters. FY27 capex is now ₹37,000–₹40,000 crore, widened from the prior ₹37,000 crore target, with management signaling potential beyond ₹40,000 crore. This is backed by a staggering order book of ₹2.20 lakh crore — ₹1.95 lakh crore in TBCB (Transmission, Business, Capital) projects and ₹0.25 lakh crore in legacy RTM (Regulated Tariff Mechanism). The bidding pipeline adds another ₹63,086 crore of prospective work, anchored in HVDC expansion and intra-state transmission corridors. On paper, this is a 6–8 year revenue visibility story. So why did Q2 revenue grow at 3%? The disconnect reveals the quarter's real challenge.

Q2 FY27, Growth Rate %
-6.19-1.064.069.197.7Transmission operating income3Consolidated revenue (net)-4.7Tariff headwind impact
Transmission growth was obscured by a ₹193 crore regulatory tariff decline. The regulatory asset base depreciates on a CERC-set schedule; POWERGRID has no control over this trajectory.
The regulatory assets which we have, the trajectory of the regulatory tariff which moves there. And ₹193 crores is on account of the regulatory tariff which moves there.
Management claims vs. what the numbers support

Operating income grew 7.7% on transmission

Reported ✓; but consolidated revenue only +3% due to regulatory tariff headwind of ₹193 Cr

Supported (context matters)

PAT grew 8–9% in consolidated operations

Delivered 8.4% YoY (₹3,866 Cr). But ₹407 Cr of this is non-operational JV interest; organic ~3–4%

Met, but quality flag

981 ckm commissioned, 14.6k MVA capacity in Q2

H1 FY27 cumulative 2,616 ckm, 25.1k MVA; execution pace consistent with historical run-rates

Supported

Capex ₹37,000 Cr, now ₹37,000–₹40,000 Cr+ (widened)

Prior target confirmed; range expanded. Q1 capex ₹5,277 Cr (14% of ₹37k, on pace)

Supported

ROW and land compensation challenges are 'under control'

Guidelines notified; state adoption underway. But project timelines extended 18 → 24–30 months on new projects; full resolution uncertain

Overstated

What changed on this call

Capex guidance widened. Prior FY27 target of ₹37,000 crore remains the minimum, now a range of ₹37,000–₹40,000+ crore with upside potential. Capitalization target refined to ₹25,000–₹30,000 crore. Driven by HVDC pipeline acceleration (₹1.36 lakh crore Green Corridor III), TBCB project ramp, and intra-state transmission expansion.

Project timelines extended. Government approval timelines for new transmission projects pushed from 18 to 24–30 months. Management cites state-by-state adoption of land compensation guidelines and right-of-way complexities. All POWERGRID-committed projects said to remain on track, but prospective work delayed.

Order book momentum. Works in hand grew to ₹2.20 lakh crore (TBCB ₹1.95 lakh crore). Bidding pipeline expanded to ₹63,086 crore intra-state, now including Green Energy Corridor III, HVDC expansion, and battery storage projects. Mix is increasingly competitive (HVDC ascending, RTM declining).

Earnings quality: what's real, what's not

The flags
  • Regulatory tariff divergence masked transmission growth

  • JV financing interest inflated PAT by ~₹407 Cr; organic growth ~3–4%

  • Right-of-way delays extend project timelines by 6–12 months

  • Execution track record strong (981 ckm Q2, on pace); equipment supply stable

  • Debt-equity 59:41; ample room for capex ramp without leverage stress

How the street is positioned

The stock sits at ₹257.95, down 29.57% from its all-time high of ₹366.25 — a significant drawdown that has pushed it below both its 50-day (₹259.61) and 200-day (₹282.69) simple moving averages. RSI at 50.1 signals neutral momentum. The bear case was priced into the decline; the question now is whether the capex ramp and ₹2.20 lakh crore order book justify a re-rating or whether near-term execution friction (ROW delays, tariff headwinds) keeps the stock anchored.

Institutional flows are mixed. FII ownership has trimmed to 24.33% (down 0.7 percentage points sequentially), while DII has added, reaching 20.70% (+0.57pp). This is neither panic nor enthusiasm — it reads as tactical caution. Recent bulk activity (June 2026 government pension fund transactions) is structural, not insider selling. The message: professionals are waiting for evidence that capex acceleration and order-book execution will translate into mid-to-high single-digit revenue growth in FY28–FY29. Until then, the stock is a 'show me' story.

The bull case, bear case, and the honest read

Ranked risks: what should concern a holder

The three threats that matter most

ROW delays compress capex execution and defer revenue recognition

High

Project timelines extended to 24–30 months vs. 18 months historical. If state adoption of land compensation guidelines stalls, capex ₹40,000 crore is achievable, but revenue translation slips to FY29+, extending the earnings drought.

Regulatory asset tariff trajectory remains negative

Medium

₹193 crore tariff headwind in Q2. Regulatory asset base (₹3,540 crore) depreciates on CERC schedule with no POWERGRID control. If acceleration persists, revenue growth stays below 5% even as order book grows.

HVDC bidding competition compresses project returns

Medium

₹1.36 lakh crore HVDC pipeline now open to competitive bidding. Management avoided quantifying EBITDA/IRR on new HVDC projects; if returns fall toward 12–13% (vs 16–18% RTM), capital deployment becomes less attractive.

Interest income normalization pressure

Low

₹1,201 crore JV interest inflated Q2 PAT by ~₹407 crore. If JV financing unwinds or rates normalize, Q3+ onwards PAT could appear softer even if core transmission grows.

What to watch next

The concrete triggers
  • 1 · FY28 capex phasing and HVDC project cost finalization

    Management deferred FY28–FY29 capex splits pending project cost clarity. Analyst pressure was firm; the next call will demand harder specificity on capex ramp profile. If FY28 capex disappoints (e.g., below ₹30,000 crore), the ₹40,000+ crore target loses credibility.

  • 2 · State adoption of land compensation guidelines and ROW timeline reset

    Government guidelines notified; state-by-state adoption underway. If major states adopt market-based compensation by Q1 FY28, timelines will compress back toward 18–20 months. If adoption stalls beyond Q1, FY29 revenue targets slip further.

  • 3 · HVDC tender results and bid/return disclosure

    22 HVDC projects (₹1.36 lakh crore) are in bidding phase. As tenders close, watch for POWERGRID to either win at lower returns (negative signal) or lose share to competitors (credibility concern). Transparency on project EBITDA/IRR will be critical to justify the capex ramp.

POWERGRID's Q2 results are a study in the gap between headline and organic. The reported 8.4% PAT growth is real, but leaned on ₹407 crore of non-operational financing income; organic transmission earnings grew around 3–4%, matching the reported 3% revenue growth. The ₹2.20 lakh crore order book is a genuine multi-year asset — it signals that the energy transition and grid modernization agenda is real. But near-term, regulatory tariff headwinds and right-of-way execution friction will keep growth in the 3–5% range through FY28. The capex upgrade to ₹37,000–₹40,000+ crore is credible (Q1 tracking suggests management has execution discipline), but the market needs to see ROW delays ease and HVDC returns prove competitive before rewarding a re-rating. This is a steady execution story, not a step-change. The number to track from here is organic PAT ex-JV interest — it will tell the true transmission growth story separate from financing noise.

Informational and educational content only. Not investment advice.