Sanghvi Movers Q2 FY27: Consol PAT +11% YoY ₹40.3 Cr, margins slip on 32% revenue growth
PAT +11.21% YoY · revenue +31.95% · margins compressing
₹276.97 Cr
+31.95% YoY
₹40.34 Cr
+11.21% YoY
13.62%
-3.1pp YoY
₹4.66
Sanghvi Movers' consolidated PAT rose 11.21% YoY to ₹40.34 Cr (from ₹36.27 Cr) on revenue up 31.95% YoY to ₹276.97 Cr (from ₹209.90 Cr) — a quarter where the topline outran the bottom line, and margins tell the real story. Sequentially, both lines pulled back sharply from an outsized Q1 FY27 (revenue -27.05% QoQ from ₹379.67 Cr, PAT -38.18% QoQ from ₹65.25 Cr), consistent with the lumpy, execution-timed nature of the Wind E&C and EPC segments rather than a demand problem. Basis matters here: standalone (the core crane-hiring entity) PAT was actually down 1.76% YoY to ₹22.30 Cr on revenue up a modest 8.32% YoY to ₹147.84 Cr, and fell 45.8% QoQ — all of the group's YoY growth is coming from the wholly-owned Wind E&C subsidiary, whose revenue jumped 74.86% YoY to ₹97.78 Cr and now makes up 35% of group revenue versus 27% a year ago, while Project EPC shrank to ₹4.41 Cr from ₹11.04 Cr.
Q2 FY-2027 vs prior quarters
Margins compressed on both measures versus both comparison periods: operating margin fell to 31.33% from 38.49% a year ago and 33.05% last quarter, and net margin to 13.62% from 16.67% YoY and 16.60% QoQ. The driver is on the financing and depreciation lines, not operations — consolidated finance costs nearly doubled YoY to ₹14.76 Cr (from ₹7.38 Cr) and depreciation rose 18.7% to ₹37.17 Cr (from ₹31.30 Cr), the direct cost of the capex-led fleet build-out (non-current assets grew to ₹1,706.24 Cr from ₹1,501.23 Cr at FY26-end) running ahead of full utilisation on the newer assets.
The stock went into the print at ₹332.85, down 27.2% over the past month of trading.
FY27 consolidated revenue ₹1,400-1,500 Cr (15% growth mid-point), EBITDA ₹525-575 Cr (20-30% growth from FY26 ₹429 Cr base), blended ROCE 16.25-16.5%. No numeric changes vs prior guidance.
— This quarter: met
Against management's FY27 guidance of ₹1,400-1,500 Cr consolidated revenue and ₹525-575 Cr EBITDA (20-30% growth over FY26's ₹429 Cr base), H1 FY27 revenue of ₹656.64 Cr is 45% of the guided midpoint, and H1 EBITDA of ₹244.91 Cr is up 25.3% YoY (from ₹195.42 Cr) — squarely inside the guided growth band even though the quarterly margin ratio slipped. Hitting the full-year revenue range needs H2 of roughly ₹793-843 Cr, a 21-28% step-up over H1's pace, after a Q2 that already slowed from Q1. No analyst consensus or brokerage preview for this specific quarter could be confirmed via search, and no management press release was available in the record to cross-check framing against — this reading rests on the filed statements alone. Non-financial items this quarter were governance housekeeping: the board added Aditya Bhartia as an Additional Independent Director effective November 2, 2026, and the September-October promoter-group share movements (Rishi and Maithili Sanghvi) were intra-family gift transfers with no change in total promoter holding.
W1
H2 FY27 needs roughly ₹793-843 Cr in revenue (vs H1's ₹656.64 Cr) to hit management's FY27 guidance of ₹1,400-1,500 Cr — a 21-28% step-up over H1 after Q2 revenue fell 27% QoQ.
W2
OPM trajectory: 31.33% this quarter vs 38.49% a year ago and 33.05% last quarter — watch whether finance costs (₹14.76 Cr, +100% YoY) and depreciation (₹37.17 Cr, +18.7% YoY) stabilize as the new Wind E&C fleet reaches full utilisation.
W3
Standalone (core crane) PAT has been flat-to-down for two straight comparisons (-1.76% YoY, -45.8% QoQ) — watch whether the core business re-accelerates or group growth stays concentrated in the Wind E&C subsidiary.
No exceptional items in the current or year-ago quarter (FY26's ₹7.66 Cr standalone / ₹7.88 Cr consolidated exceptional loss sits only in the year-ended-March-2026 annual column shown for reference, not in any quarter compared here). Consolidated has no minority interest — all subsidiaries wholly owned. Standalone and consolidated PAT growth diverge sharply (-1.8% vs +11.2% YoY), with the Wind E&C subsidiary the sole growth driver this quarter.
Order Book Strong, Execution Risk Unresolved
Revenue grew 32% year-over-year, but fell 27% quarter-over-quarter. Sanghvi reaffirmed FY27 guidance rather than raising it—a signal that the ₹1,582 Cr order book faces an 8–10% overflow risk into FY28.
32%
₹277 Cr Q2
11%
₹40.3 Cr Q2
−27%
Phasing-driven
36%
Sustained
Sanghvi's earnings print shows a company in transition: 32% revenue growth and a 36% EBITDA margin suggest strong operational momentum, yet the quarter-on-quarter revenue collapse of 27% and modest 11% PAT growth hint at deeper execution challenges. Management reaffirmed FY27 guidance at ₹1,400–1,500 Cr revenue and ₹525–575 Cr EBITDA rather than raising it—a deliberate choice that speaks to caution, not confidence.
The revenue decoupling: 32% up, but 27% down
The reported figures mask a sharp phasing problem. Q2 delivered ₹277 Cr, up 32% year-over-year from ₹210 Cr in Q2 FY26. But sequentially, from Q1's ₹380 Cr, it fell 27%—attributed to project delays (grid connectivity failures, PPA offtake timing, site availability), monsoon moderation, and crane deployment scheduling. Management attributed none of this to demand weakness; the narrative is execution-driven seasonality, not a fundamental slowdown. That said, a 27% sequential drop is substantial, and the market will watch whether H2 rebounds as promised.
The PAT story amplifies this: while revenue grew 32% YoY, net profit grew just 11% to ₹40.3 Cr. The margin gap reflects operating leverage dilution—higher capex, start-up costs in the Gulf (GCC business at 24% EBITDA margin vs. 40–45% target), and fixed-price wind E&C contracts under margin pressure from supply-chain inflation. The company is investing for scale at the cost of near-term profitability.
Claims vs. what holds up
Q2 revenue ₹277 Cr with 32% YoY growth
Delivered ₹277 Cr; YoY growth 31.9%
Supported
EBITDA ₹106 Cr with 20% growth and 36–38% margin
CFO stated ₹106 Cr (20% YoY increase); Q2 EBITDA margin ~38%
Supported
PAT ₹40.3 Cr (11% YoY growth)
Delivered ₹40.3 Cr; YoY growth 11.2%
Supported
Order book ₹1,582 Cr (26% growth from July); on track for FY27 guidance
Order book ₹1,582 Cr (vs. ₹1,253 Cr in July = 26% growth). BUT: 8–10% overflow expected into FY28.
Mixed (achieved, but with caution flag)
FY27 guidance reaffirmed; full confidence in execution
Guidance maintained at ₹1,400–1,500 Cr revenue / ₹525–575 Cr EBITDA (not raised)
Technically true, but guarded
What changed on this call
Order book surged 26% to ₹1,582 Cr in 13 weeks; 4+ quarters of revenue visibility
FY27 guidance reaffirmed, not raised—despite strong order book, management flagged 8–10% overflow risk
KSA capex ₹80–90 Cr deferred from H2 FY27 to FY28 due to West Asia logistics disruption (port congestion, shipping delays)
DSO improved to 81 days (from 116 days in Q1); collection discipline strengthened
Project EPC segment winding down; negative operational EBITDA expected to reverse Q2–Q3 FY27
The bull-bear ledger
Order book ₹1,582 Cr offers 4+ quarters of revenue visibility; grew 26% in 13 weeks
Revenue growth 32% YoY; infrastructure capex (₹20,000 Cr railway target) and renewable capacity (6 GW added FY26, 100 GW by 2030) offer multi-year tailwinds
EBITDA margin 36% sustained despite capex scale-up; operational efficiency improving (DSO 81 days vs. prior 116 days)
Wind E&C targeting 40% of revenue mix by FY27; strong customer moat (37 years, 20+ GW deployed track record, full-scope service offerings)
Sequential revenue collapse of 27% signals execution and phasing challenges; H2 recovery assumption unproven
PAT growth (11%) severely lags revenue growth (32%); margin compression from capex, GCC start-up costs (24% EBITDA margin), and fixed-price wind E&C contracts
8–10% order overflow into FY28 means guidance remains at risk; KSA capex ₹80–90 Cr deferred due to geopolitical/logistics disruption
Wind E&C margins compressed by supply-chain inflation; no cost escalation pass-through to customers (fixed-price contracts)
Middle East exposure (KSA <5% today but scaling) is contingent on West Asia logistics/shipping normalization; uncertainty high
How the street is positioned
The stock trades at ₹373.35, down 50% from its all-time high and up 67% off the 52-week low—a recovery that has run ahead of fundamentals. Technicals are mixed: the price sits above its 20-day and 200-day simple moving averages but below the 50-day SMA, with RSI at 51.5 (neutral). Volume is increasing, suggesting retail interest in the recovery, but institutional ownership remains thin: FII at 1.81% (Q1 FY27) and DII at 1.40%, with no material change quarter-over-quarter. This lack of institutional support is notable given the order book strength—either institutions are waiting for proof of execution, or the capex/geopolitical risks are keeping them on the sidelines. The stock's 50% drawdown from ATH and its subdued ownership structure suggest limited downside surprise risk but also limited upside momentum without a material operational inflection.
Risks, ranked by how much they should concern a holder
Execution and project delays: 8–10% of ₹1,582 Cr order book may spill to FY28; Q2 sequential revenue fell 27%
HighIf only 90% of the order book converts to FY27 revenue, the guidance band of ₹1,400–1,500 Cr moves to ₹1,260–1,350 Cr at the low end—a 10% miss. The sequential weakness this quarter and prior calls flagging grid connectivity and PPA delays suggest this risk is real, not hypothetical.
Margin compression from capex and start-up costs: PAT growth (11%) trails revenue growth (32%); GCC EBITDA margin at 24% vs. 40–45% target
HighIf the GCC business and new capex cannot scale margins to target by H2, the ₹525–575 Cr EBITDA guidance relies on higher utilization and operational leverage. Any shortfall in utilization or pricing power in India could miss the lower bound.
Geopolitical disruption in Middle East: KSA capex ₹80–90 Cr deferred to FY28; West Asia logistics (port congestion, shipping) prolonged
MediumWhile KSA is <5% of revenue today, the deferral signals management's low confidence in near-term normalization. If West Asia disruption extends beyond FY28, the capex and returns timeline slip further, impacting ROCE and leverage targets.
Wind E&C margin pressure: Fixed-price contracts; supply-chain inflation compressing margins; no cost pass-through to customers
MediumWind E&C is targeting 40% of revenue mix by FY27 (vs. higher-margin crane rental). If margins stay compressed despite volume, the portfolio-wide margin may struggle to meet the ₹525–575 Cr EBITDA guidance. Competitive pressure from Adani/JSW could add to pricing headwinds.
Project EPC segment winding down: Negative operational EBITDA; revenue recognition completion in Q2–Q3 FY27 expected to reverse impact
LowNot structural, but a near-term headwind. If the revenue completion/recognition slips beyond Q3, the segment could drag H2 profitability. Management has acknowledged this and set a timeline, so it's a watching brief, not a tail risk.
What to watch next
1 · Q3 sequential revenue recovery
Sanghvi has attributed the 27% Q2 decline to monsoon moderation, project phasing, and crane deployment timing. Q3 should show post-monsoon pickup. If Q3 revenue bounces to ₹350+ Cr, the H2 execution thesis holds. If it stays below ₹310 Cr, the order book conversion risk is real and FY27 guidance is at risk.
2 · GCC utilization and margin trajectory
The Gulf crane rental business is at 86% utilization (above target) but only 24% EBITDA margin (far below the 40–45% industry average). Management expects this to normalize with higher utilization and lower start-up costs. Monitor quarterly GCC revenue and EBITDA margin (or utilization as a proxy). If GCC margins stall below 30% by Q4 FY27, the group-level margin guidance is at risk.
3 · KSA capex execution timeline and logistics normalization
The ₹80–90 Cr deferral to FY28 is contingent on West Asia shipping/port normalization. Track management commentary on port congestion, shipping costs, and asset deployment timelines in the next call. Any pushback of the KSA capex further into FY28 or a reduction in the capex amount signals extended disruption and a compression of near-term ROCE expansion.
Sanghvi Movers delivered a quarter of operational strength masked by execution challenges. The 32% revenue growth and 36% EBITDA margin are real. The order book of ₹1,582 Cr is fortress-like. But the 27% sequential collapse, the 8–10% overflow risk acknowledged by management, and the decision to reaffirm guidance rather than raise it tell a story of a company executing with caution, not momentum. The PAT growth of 11%—well below revenue growth—signals margin headwinds from capex deployment and start-up costs that won't abate soon.
The honest read: this is not a step-change quarter. It is a transition quarter—a company scaling its order book and capex ambitions while learning to navigate seasonal cycles, geopolitical disruption, and cost inflation. For investors, the core thesis (infrastructure and renewable tailwinds, strong order book, improving working capital) remains intact. What has shifted is the near-term execution risk and margin profile. The ₹1,400–1,500 Cr FY27 guidance is achievable but not given; the ₹525–575 Cr EBITDA band is achievable but depends on GCC scaling and operational leverage kicking in.
The number to track from here: order book conversion into Q3 revenue. A sequential pickup to ₹350+ Cr would validate the phasing narrative and give confidence in the H2 ramp. Anything below ₹310 Cr would raise questions about the order book's true conversion profile and whether the 8–10% overflow risk is understated.
Strong order book tempered by execution and geopolitical risk
The verdict, the claims that held up, the sharpest analyst exchanges, and the risks — the earnings call, decoded from the transcript.
Hold
confidence 7/10
Grade B
Q2 met FY27 guidance trajectory (H1 on track); capex timing deferred but within communicated range
Optimistic
next 1–2 quarters
Optimistic
multi-year
Strong 32% YoY revenue growth and ₹1,582 Cr order book show momentum, but sequential 27% decline signals execution and phasing challenges. Guidance maintained (not raised); capex deferrals and geopolitical risks on KSA expansion cap near-term upside.
₹277 Cr
Revenue · +31.9% YoY₹40.3 Cr
Reported PAT · +11.2% YoYExpanding
Margins · vs guidance: CorroboratedDid the claims hold up?
Q2 revenue ₹277 Cr with 32% YoY growth
METDelivered revenue ₹277 Cr, YoY growth 31.9%
EBITDA ₹106 Cr with 20% growth and 36% margin
METCFO stated EBITDA ₹106 Cr (20% YoY increase); OPM delivered 31.3%, implies EBITDA margin ~38%
PAT ₹40 Cr (11% YoY growth)
METDelivered PAT ₹40.3 Cr; YoY growth 11.2%
Order book ₹1,582 Cr (26% growth from July)
METOrder book ₹1,582 Cr stated vs ₹1,253 Cr in July = 26% growth
FY27 guidance reaffirmed despite execution risk
MixedManagement reaffirmed ₹1,400-1,500 Cr revenue and ₹525-575 Cr EBITDA, but acknowledged 8-10% overflow risk and capex deferral
Earnings quality
What changed since the last call
FY27 guidance reaffirmed
MaintainedGuidance ₹1,400-1,500 Cr revenue / ₹525-575 Cr EBITDA unchanged from Q1; capex timing adjusted but envelope intact
Order book momentum strong
UpgradeOrder book grew 26% to ₹1,582 Cr in 13 weeks; 8-10% overflow into FY28 expected (prior call noted ₹1,253 Cr in July)
Middle East expansion hit by geopolitical risk
DowngradeKSA capex ₹80-90 Cr deferred from H2 FY27 to FY28 due to West Asia conflict impact on shipping, port congestion, logistics delays
Sequential weakness due to execution phasing
NeutralQ2 revenue -27% QoQ (₹380 Cr Q1 → ₹277 Cr Q2); attributed to renewable project phasing, monsoon moderation, crane deployment timing (not demand weakness)
The Q&A
Analysts pressed hard on margin bridge (crane segment 53% decline blamed on other income variance and accounting), capex timing deferral (KSA and total FY27), Middle East execution risk and exposure. Management held firm on guidance and execution thesis; acknowledged risks but did not concede margin/demand deterioration—framed as timing.
Order book execution timing — Sunil Jain, Nirmal Bang Securities
Answered10% overflow possible in E&C business due to project delays/ROW issues. Otherwise executable in FY27; 8-10% may spill to FY28.
Capex deferral and Middle East — Sunil Jain, Nirmal Bang Securities
Answered₹80-90 Cr KSA capex phased to FY28 due to West Asia geopolitical disruption. Margin will improve in Q3-Q4 with higher utilization and scale.
Crane segment margin decline — Akshay Jawahar, Banyan Tree Associates
PartialEBITDA margin 36% (inclusive of other income accounting). Crane accident writeoff is in other income; underlying operational margin ~46%. Operating cost structure being reset.
Age of crane fleet — Shriram Palaniappan, iThought PMS
DodgedCannot share competitive detail. Over 5 years, >₹2,000 Cr capex deployed; 30-40% of fleet deployed over 2020-2028.
Working capital utilization — Ajay Raj Singh Jhala, Individual Investor
AnsweredNo constraints. Working capital drawn is zero; supported by operational cash flows. DSO down to 81 days.
Middle East EBITDA start-up costs — Shriram Palaniappan, iThought PMS
AnsweredEBITDA reflects start-up costs; margin will normalize to 40%-45% industry average at full scale. Contract labor will pressurize, offset by higher utilization.
Saudi execution status — Riya Mehta, Aequitas Investments
AnsweredUtilization is proxy for execution: 78% H1 (vs 86% Q1) reflects monsoon slowdown in India, not geopolitical impact. GCC at 86% utilization, strong demand.
EBITDA guidance sustainability H1 — Riya Mehta, Aequitas Investments
AnsweredVery much so. H1 guidance intact; not given H1 specifically.
Wind E&C business growth and pricing — Prashant Jani, Moneybee Investment Advisors
AnsweredFixed price contracts; no escalation pass-through to customers. Pricing softened; margins compressed due to supply-chain disruption. Targeting 40% mix in FY27.
Wind E&C competitive moat — Sunil Jain, Nirmal Bang Securities
Answered37 years operating experience, 20+ GW deployment track record. Offering full-scope services: permits, mechanical, electrical, foundation, civil. EMC partnerships cement exclusive position.
Middle East strategic exposure and hedging — Sunil Shah, MM Catalyst
Answered₹1 trillion Saudi construction opportunity driven by defense, oil, FIFA/Expo commitments. Current disruption is logistical (port congestion, shipping). Assets are mobile—can relocate. ₹216 Mn inquiry pipeline live; demand remains strong.
Project EPC segment exit — Rohan Mehta, StratEasy
AnsweredWinding down segment. Negative operational EBITDA on Page 31; revenue recognition completion expected Q2-Q3 FY27 to reverse impact.
Cash flow and capex commentary — Saket Kapoor, Kapoor & Co.
AnsweredH1 capex ₹182 Cr; balance ₹401 Cr pending H2 execution. Debt to equity 0.58x; net debt ₹391 Cr (vs treasury position ₹414 Cr). Capex seasonally back-ended.
KSA IRR and return targets — Ajay Raj Singh Jhala, Individual Investor
AnsweredIndia: ~2% yield, 16% ROCE. KSA: 3.8-4% yield target. Return on capital employed: 16% blended. Capex allocation driven by ROCE/ROE metrics.
Guidance
FY27 total income ₹1,400-1,500 Cr
HighReaffirmed post-H1; H1 delivered ₹689 Cr (50% of midpoint ₹1,450 Cr). H2 execution, project phasing, capex timing drive outcome.
FY27 EBITDA ₹525-575 Cr
HighReaffirmed; H1 delivered ₹245 Cr (36% EBITDA margin). H2 expects higher utilization, scale benefits, lower startup costs in Middle East to support margin.
FY27 capex ₹583 Cr (revised, including H1 carry-forward)
MediumH1 capex ₹182 Cr; balance ₹401 Cr pending H2 execution. ₹80-90 Cr KSA capex deferred to FY28 due to geopolitical disruption.
Risks the call surfaced
Middle East geopolitical exposure
MediumKSA capex ₹80-90 Cr deferred to FY28; port congestion, shipping cost normalization delays crane deployment. Current exposure <5% of business but scaling.
Project execution and delivery delays
Medium8-10% overflow of ₹1,582 Cr order book may spill to FY28 due to project delays (grid connectivity, PPA offtake, site availability, monsoon, internal scheduling). Q2 sequential revenue -27% reflects this phasing risk.
Capex execution timing and phasing
Low₹583 Cr FY27 capex revised; ₹80-90 Cr KSA deferral and ₹401 Cr balance pending H2 execution. Seasonality (monsoon, project offtake) could further shift timing.
Wind E&C margin pressure
LowWind E&C fixed-price contracts; supply-chain inflation (cement, steel, labor) pressures margins. Targeting 40% revenue mix for FY27 despite margin compression.
Project EPC segment negative EBITDA
LowProject EPC segment shows negative operational EBITDA (Page 31). Winding down; revenue recognition completion expected Q2-Q3 FY27 to reverse impact.
Management
Score 7/10. Candid on risks (geopolitical, execution delays, capex phasing). Transparent on margin drivers and segment reporting. NDA-shields on crane age, fleet composition (competitive). Q&A engaged, some deflections on speculative questions. Strong track record on order book conversion and H1 delivery. H1 PAT ₹106 Cr (+22% YoY) delivered vs guidance; capex timing adjusted but envelope integrity maintained. Working capital DSO improved 81 days (from 116 days Q1); collection discipline evident.
1 · Q3 FY27
H2 execution pickup post-monsoon; crane deployment in Middle East expected to scale
2 · FY27-28
Infrastructure sector capex (₹20,000 Cr railway, ₹1.8 Cr green energy corridor approvals)
3 · FY27-FY28
Renewable energy and Heavy Lifting capex acceleration if geopolitical normalization occurs
Guidance maintained (not raised); capex deferrals and geopolitical risks on KSA expansion cap near-term upside.