StockWatch
·
Other Electrical Equipment
Expansion24 Aug 2026, 08:12 pm

Fujiyama Power Systems Expands with 1 GWh Tubular Battery Facility

AI Summary

Fujiyama Power Systems Limited announced the establishment of a new 1 GWh Tubular Batteries manufacturing facility in Hathras, Uttar Pradesh. This expansion is part of a broader board-approved strategy that also includes enhancing Lithium Batteries manufacturing capacity by 1 GWh at their Ratlam Plant in Madhya Pradesh. The board also approved amendments to the Articles of Association and the re-appointment of Mr. Sunil Kumar as a director liable to retire by rotation. The meeting was held on August 24, 2026.

Key Highlights

  • New 1 GWh Tubular Batteries manufacturing facility to be established in Hathras, Uttar Pradesh.
  • Lithium Batteries manufacturing capacity to be enhanced by 1 GWh at Ratlam Plant.
  • Board approved amendments to Articles of Association.
  • Mr. Sunil Kumar re-appointed as director liable to retire by rotation.