
Project Update17 Apr 2026, 11:13 am
NTPC Green Energy declares COD for 150 MW solar project in Rajasthan
AI Summary
NTPC Ltd's subsidiary, NTPC Green Energy Limited (NGEL), announced the Commercial Operation Date (COD) for 150 MW of solar capacity. This capacity is part of a larger 300 MW solar project located in Rajasthan, developed by Project Sixteen Renewable Power Private Limited, a step-down subsidiary of the ONGC NTPC Green Private Limited joint venture. The COD is effective from April 18, 2026. With this addition, the NTPC Group's total installed capacity reaches 89,528 MW and commercial capacity stands at 88,448 MW. The NGEL Group's total installed capacity will increase to 10,276.40 MW.
Key Highlights
- NGEL declared COD for 150 MW solar capacity in Rajasthan.
- This capacity is from a step-down subsidiary of ONGC NTPC Green JV.
- NTPC Group's total installed capacity now stands at 89,528 MW.
- NGEL Group's installed capacity increases to 10,276.40 MW.
- The commercial operation is effective from April 18, 2026.