StockWatch
·
OM POWER TRANSMISSION LTD · QQ2 FY-2027 · THE CALL

Strong order momentum offsets receivables drag; 765 kV entry sets up multi-year runway

The verdict, the claims that held up, the sharpest analyst exchanges, and the risks — the earnings call, decoded from the transcript.

Q2 FY27 resultsOMPOWEROm Power Transmission Ltd07 Nov 2026 · 6 min read
Verdict

Hold

confidence 7/10

Credibility

Grade B

Met 50% growth guidance; delivered margins above 12–13% range maintained. Track record solid but guidance consistently conservative vs. delivery.

Short-term outlook

Optimistic

next 1–2 quarters

Long-term outlook

Very Optimistic

multi-year

Strong order momentum and 765 kV entry support multi-year upside; Q2 beat margins guidance, but high receivables (₹237 Cr, 45% of revenue) and execution risk in new segment cap near-term. Order book of ₹839 Cr (1.9x quarterly revenue) gives clear visibility.

₹128.3 Cr

Revenue · +56.4% YoY

₹13.8 Cr

Reported PAT · +116.7% YoY

Expanding

Margins · vs guidance: Corroborated

Did the claims hold up?

Management's claims vs. the numbers

Order book ₹839 Cr; Oct wins ₹273 Cr

MET

Sept 30 book ₹565.99 Cr + Oct wins detailed (220 kV GETCO, underground cabling). Oct total ₹273.21 Cr

Revenue growth 50% will be achieved FY27

MET

Q2 FY27 at 56.4% YoY, H1 at 46.3% YoY. On pace to exceed 50% full-year

Margins elevated this quarter on project mix; yearly range 12–13% EBITDA

MET

Q2 EBITDA margin 15.25% vs guidance 12–13%; H1 margin 13.74%. Claim backed; guidance conservative

Order execution 12–24 months typical

MET

All Q&A responses confirm 12–24 month project cycle. 765 kV orders 24–36 months

Gujarat underground cable mission driving new order wins

MET

11 kV PGVCL, 66 kV GETCO, UGVCL Ambaji orders received/in pipeline. Government ₹500 Cr first phase provision confirmed

Earnings quality

What changed since the last call

Deltas vs. the prior call

Order inflow acceleration post-monsoon

Upgrade

GETCO tenders opened in Sept–Oct after slow start (prior call mentioned slowness). Oct alone delivered ₹273 Cr. Q2 order book stood ₹565.99 Cr; now ₹839 Cr post-Oct wins.

Entry into 765 kV segment

New

Management announced 765 kV capability build-out (GETCO planning 765 kV network; Power Grid tenders forthcoming). Company targeting these after 400 kV GIS success. Target ₹1,600 Cr bid pipeline for 765 kV included.

Receivables accumulation

Downgrade

Trade receivables ₹237 Cr vs. ₹221.42 Cr March 2026. Absolute increase of ₹16 Cr despite revenue growth, driven by 24-month project cycle nearing completion (retention accumulation in final 3–4 billing periods).

Finance cost trajectory

Neutral

Borrowing cost 9–10% (prior: not quantified). CRISIL upgrade expected to lower to 8%. Bank guarantee commissions rising due to large order base (e.g., 10% guarantee on GETCO contracts). Temporary headwind, mitigated by IPO proceeds deployment.

The Q&A

Analysts pressed hard on receivables (Tejas Khandelwal, Akshay Darji), margin sustainability under new project mix (Rounak Bajpai), and execution risk on 765 kV (Yashvi Gandhi). Management held firm on project cycle explanation, reaffirmed 12–13% EBITDA margins, and cited Dholera success as proof of capability. Minor evasion on FY30 numbers; otherwise answers were detailed and specific.

The exchanges that mattered

765 kV timeline & margin mix — Rounak Bajpai, Wealthmine Advisory

Answered

765 kV orders 24–36 months execution. Transmission line (79% H1 revenue) higher margin than sub-station (17%). Q2 elevated on project mix + Dholera GIS execution. Yearly range 12–13% EBITDA, 8–9% PAT maintained; quarterly variance on project mix.

Receivables not improving — Tejas Khandelwal, Prudent Equity

Answered

Receivable days improved: 176 days (March 2023) → 140 (Mar 24) → 118 (Mar 26). Cash collects within 12–24 month project cycle. Current 45% reflects advanced execution stage on large orders (3–4 month final billing pattern). Normalizes after project closure.

Underground cabling margin vs. transmission — Yashvi Gandhi, Molecule Ventures

Answered

Transmission line highest margin. Underground cabling lower but sufficient to maintain 12–13% EBITDA. Business decision: participate in Gujarat mission (structural opportunity), maintain blended margin discipline.

FY30 vision & sales target — Arjun Vinay Tambe, Aurevia Crest

Partial

Don't want to discuss numbers. At much higher scale. Participating in 765 kV + GIS tenders; FY30 targeting ₹2,500 Cr revenue. Just commissioned 1 GIS substation; upcoming tenders will build GIS order book for higher revenue mix.

Order pipeline conversion & receivables detail — Akshay Darji, Selfshine Industries

Answered

Pipeline conversion 3–4 months. Receivables: 84% of debtors <6 months old. Retention accumulated in final 3–4 months of 12–24 month projects; released after completion. Sept 26: 45% receivables; normalizes as projects close.

State expansion & Dholera marquee project — Gayneshwar, Individual Investor

Answered

Substantial 765 kV orders in pipeline. Expanding state-wise; some bids in Delhi, Madhya Pradesh. No wins yet outside Gujarat. Dholera: Package 2 by Dec, Package 3 by March. This marquee success builds credentials for future GIS substation orders.

Guidance

Forward guidance and management's confidence

FY27 50% growth maintained

High

Historical 50% CAGR (3–4 years per call). Q2 at 56.4% YoY, H1 at 46.3%. Order book ₹839 Cr (1.9x Q2 revenue) supports full-year visibility. Execution timeline 12–24 months.

EBITDA 12–13% annually; PAT 8–9% annually

High

Reaffirmed on call despite Q2 delivering 15.25% EBITDA, 10.7% PAT. H2 expected 14–15% range (elevated project mix). Yearly guidance reflects normalized mix across transmission, sub-station, O&M.

IPO proceeds ₹10.75 Cr allocated to machinery & equipment

Medium

Deployed in line with project requirements. Company notes capacity will scale with order book (execution 12–24 months allows just-in-time deployment). No specific FY27 capex target given.

Risks the call surfaced

Ranked by how much they should concern a holder

Execution risk (765 kV)

Medium

Company newly entered 765 kV segment; largest prior project is 400 kV GIS Dholera. 765 kV orders require 24–36 month cycles, complex skills (pile foundation, river crossing, HVDC). Pipeline ₹1,600 Cr includes 765 kV; if execution slips or cost overruns occur, profitability at risk.

Working capital / receivables

Medium

Trade receivables ₹237 Cr = 45% of Sept revenue. While management cites 12–24 month project cycle and cash collection within that window, absolute receivables spike from ₹221.42 Cr (March 2026) to ₹237 Cr. If project delays occur or payment terms extend, working capital stress rises. IPO cash deployment provides buffer, but runway finite.

Customer concentration

Medium

Order inflow heavily dependent on PSU utilities: GETCO, Power Grid, municipal corporations. ₹273 Cr Oct wins include GETCO orders. ₹1,600 Cr bid pipeline skewed towards GETCO, Power Grid. If tender delays, budget cuts, or policy changes occur, order inflow dries up.

Finance cost / leverage

Low

Borrowing cost 9–10% currently (vs. 8% expected post-CRISIL upgrade). Bank guarantee commissions rising due to large order base (10% performance guarantee on GETCO contracts). Finance cost as % of profit could compress margins if debt not de-leveraged rapidly.

Margin pressure from segment mix

Low

If underground cabling orders (lower margin than transmission line) and O&M segment scale significantly, blended margin could compress below 12–13% EBITDA guidance. Q2 benefited from transmission line dominance (79% of H1 revenue) and Dholera GIS execution.

Management

Score 8/10. Kalpesh Patel articulate on strategy; Chetan Modi detailed on working capital, receivables cycle, and finance. Fenil Patel candid on FY30 vision (₹2,500 Cr, no specific numbers wanted) and GIS ramp. Minor hedge: won't discuss detailed FY30 targets. Track record strong: 50% CAGR met/beaten (56.4% Q2, 46.3% H1). Guidance conservative (12–13% EBITDA vs. delivered 15.25%; 8–9% PAT vs. delivered 10.7%). Dholera GIS flagship near completion (Dec & Mar milestones on track). 765 kV segment entry unproven but well-articulated.

What to watch next
  • 1 · Nov–Dec 2026

    Dholera 400 kV GIS substation Package 2 completion (Dec); Package 3 by March 2027

  • 2 · Dec 2026–Mar 2027

    ₹273 Cr Oct order wins (GETCO 220 kV, PGVCL 11 kV, UGVCL underground cabling) execution ramp-up

  • 3 · Q3–Q4 FY27

    Bid pipeline conversion (₹1,600 Cr bid pipeline; 3–4 months conversion timeline per management)

Order book of ₹839 Cr (1.9x quarterly revenue) gives clear visibility.

Informational and educational content only. Not investment advice.