Volume ramp-up and margin sustenance: reading the new normal
KEI heads into Q2 as a growth story re-rated on infrastructure tailwinds and Sanand facility coming online. On plan means maintaining ~20% revenue growth and sustaining 10.5–11% margins as the new unit ramps. Street remains bullish but at fair value.
What to expect
~₹3,270–3,320 Cr
20–21% YoY growth; on-plan trajectory vs 19.4% in Q2 FY26
~10.5–11%
Management guided 10.5–11% (incl. other income) for FY27; Q1 was healthy
~₹343–364 Cr
Implies 10–11% net margin; tax normalization key
~17–18%
Driven by cable-wires segment; Sanand facility on track
A strong Q2 would hold margins at 11%+ (above guided range) while delivering 22%+ revenue growth—proof that Sanand ramp and demand tailwinds are compounding. A weak print would miss revenue (sub-20% growth) or margins below 10.5%, signalling either demand slip or integration costs overrunning plan.
Is the company on track?
Yes, on both fronts. Q1 FY27 revenue of ₹3,185 Cr (up 22.97% YoY) and PAT ₹274 Cr (up 40.1% YoY) landed ahead of the historical trajectory. Management's 20%+ FY27 growth target and 10.5–11% margin guidance remain credible—the cable-wires segment is growing 23% YoY, and the Sanand facility (new unit commissioned in H2) is on track to drive 17–18% volume growth. The ₹700 Cr Rajasthan expansion, approved in August, is layered in as a 2027+ growth vector. Full-year run-rate suggests Q2 needs ~20% growth and sustained margins to stay in-line.
What the Street says
Since last quarter
Oct 14
ESG rating upgraded to 'Excellent' (71) by ERAIL
ESG credential boost; non-material operationally
Oct 8
GST demand reduced by ₹4.46 Cr on appeal
One-time tailwind to Q2; reduces contingent liability
Oct 1
GST demand notice, ₹17.1 lakh (Ahmedabad South)
Routine; immaterial
Sep 24
Trading window closed for result intimation
Standard pre-announcement compliance
Aug 3
₹700 Cr capacity expansion approved in Rajasthan (Salarpur, Khairthal-Tijara)
Growth capex; materially accretive 2027+; funded via QIP
1 · Revenue growth trajectory
Expect ₹3,270–3,320 Cr on ~20% growth. If above ₹3,350 Cr (22%+), Sanand is outperforming; below ₹3,200 Cr, demand may be softening or mix is adverse.
2 · EBITDA margin hold
Target 10.5–11%. Margins above 11% confirm pricing power and volume leverage intact; dips below 10.5% flag raw-material or labour cost pressure ahead of Sanand ramp.
3 · Sanand facility status update
Confirmation of ramp timeline (H2 Nov–Jan) and utilization rate will shape FY27 guidance credibility. Any delay or under-utilization would reset 17–18% volume growth assumption.
KEI enters Q2 as a textbook infrastructure play: growth-stage, margin-expanding, capex-backed by a facility ramp and a ₹700 Cr expansion in the pipeline. The Street has priced in the 20% growth and 10.5–11% margins story; Q2 is a show-me quarter on execution. A clean print maintains the momentum; a miss would reset the premium. Watch revenue breadth (cable-wires still the engine?), margin sustenance as Sanand comes online, and any forward commentary on raw-material or demand headwinds.
KEI Q2FY27: Revenue up 39% YoY to ₹3,776 Cr, PAT misses Street as EPC swings to loss
PAT +28.96% YoY · revenue +38.52% · margins compressing · miss vs street
₹3,776.42 Cr
+38.52% YoY
₹262.45 Cr
+28.96% YoY
6.9%
-0.4pp YoY
₹27.45
KEI Industries posted consolidated revenue of ₹3,776.42 Cr for Q2FY27, up 38.5% YoY (+18.6% QoQ) and well ahead of our pre-result preview band of ₹3,270–3,320 Cr. Consolidated PAT of ₹262.45 Cr grew 29.0% YoY but fell 4.3% QoQ, and came in 24–28% below the ₹343–364 Cr pre-result estimate — a clear miss on the bottom line even as the top line beat. Basic EPS was ₹27.45, down from ₹28.68 in Q1FY27 but above ₹21.30 a year ago.
Q2 FY-2027 vs prior quarters
The miss traces to the EPC Projects segment, which swung to a segment loss of ₹8.93 Cr versus a ₹5.13 Cr profit in Q2FY26, dragging consolidated net segment results even as the core Cables & Wires business grew revenue 39.7% YoY to ₹3,685.22 Cr with segment margin steady-to-better at ~11.3% (from ~10.9% a year ago). Layered on top, finance costs rose 20% YoY to ₹103.3 Cr and depreciation rose 51% YoY to ₹30.6 Cr as capital work-in-progress (₹1,271.9 Cr, roughly double the ₹634 Cr segment-asset base a year ago) builds out the Sanand and new Salarpur capacity. Net result: consolidated net margin slipped to roughly 6.9% of revenue, down from 8.55% in Q1FY27 and 7.35% in Q2FY26 (per our records) — a YoY and QoQ compression, since PAT grew slower than revenue on both counts.
The stock went into the print at ₹4,230.4, down 9% over the past month of trading.
For context: revenue is at a 6-quarter high.
FY27 revenue >20% (hedged; management says likely >25%, down from prior 25-30%). Operating margins 11-12% range (raised from prior 10.5-11%). Sanand FY27 ₹1,500-2,000 Cr (vs media-claimed ₹3,000 Cr, corrected). Annual capex ₹600-700 Cr/year for next 3-4 years, new Salarpur ₹700 Cr project announced.
— This quarter: beat
Against management's own guidance, the quarter is ahead: H1FY27 revenue grew 31.0% YoY to ₹6,961.76 Cr, above the raised >25% FY27 revenue bar (up from an original >20%), and H1 segment-result margin of ~11.9% of revenue from operations sits inside the raised 11–12% operating-margin guidance band — so on management's own metrics this reads as on-track-to-beat, even though it missed our Street-level PAT estimate. No standalone management press release was available for this filing to cross-check framing beyond the board-meeting letter and the financial statements themselves. Within this quarter's other developments, the GST demand was reduced by ₹4.46 Cr (immaterial to the P&L) and the company received a separate ₹17.1 lakh GST demand order; neither is financially significant. More material is the Income-Tax search conducted in May 2026, which the auditors' limited review flags again this quarter as unresolved, with impact 'not ascertainable' — a disclosed but unquantified overhang. The ₹2,000 Cr QIP from November 2024 continues to fund the capacity build, with ₹162.9 Cr still unutilised and parked in bank deposits/monitoring account.
W1
EPC Projects segment — can it return to profit after this quarter's ₹8.93 Cr segment loss?
W2
Operating margin trajectory vs management's raised 11-12% guidance band as Sanand capacity ramps (H1 running ~11.9% on a segment-result basis).
W3
Quantification of the Income-Tax search impact, flagged by auditors as 'not ascertainable' since May 2026.
Consolidated = standalone (associate KEI Cables SA Pty Ltd, South Africa, reported Nil profit/loss, certified by management as immaterial). No exceptional items either period. Auditors flag an unresolved Income-Tax search at company premises since May 2026 with impact 'not ascertainable'; current tax includes ₹5.88 Cr of earlier-years tax, deferred tax net of ₹5.61 Cr earlier-years DTA.